The Setting
Together with an ICT facility, a state of the art Design and Technology block and a 20m heated outdoor swimming pool and changing rooms, the Pre-Preparatory building completes a third quadrangle in a setting that is secure, secluded and inspirational. This third quadrangle of the school complex extends towards the banks of the Itchen tributary and Wolvesey Palace, nestling harmoniously in its picturesque location of ancient trees, medieval buildings and wide lawns, overlooked by the towering wonder of the 900 year-old Winchester Cathedral.

